Laserfiche WebLink
DIVISION 1 - GENERAL REQUIREMENTS <br />SECTION 01010 - SUMMARY OF WORK <br />FART 1 - GENERAL <br />1.01 Mobilize and perform necessary site preparatory work, quality control, and all other work <br />specified in Divisions 1 and 2 of these specifications. <br />1.02 Furnish and install all labor and materials for site preparation, river protection, engineered fill, <br />excavation, finish grading of the spillways and access roads, grading of the mine site to subgrade <br />topography, importing and placing six inches (6") of topsoil on the subgrade, drill seeding, <br />hydroseeding, and having King Surveyors provide an as -built topographic survey of the Iverson <br />Mine permit area. <br />1.03 Perform all miscellaneous items necessary, and as directed, for a complete, functional, and <br />reclaimed facility. <br />1.04 Demobilize and perform site cleanup as necessary. <br />END OF SECTION <br />Iverson Mine Grading _ Section 01010 - Summary of Work <br />133-24097-15001 Page I of 1 <br />