My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-03_PERMIT FILE - C1980004 (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2017-02-03_PERMIT FILE - C1980004 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 9:04:09 AM
Creation date
7/13/2017 9:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Permit File
Doc Date
2/3/2017
Section_Exhibit Name
Appendix U Construction Quality Assurance Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM Colorado <br />#00489-0002 <br />01/06/12 <br />Huddleston -Berry <br />l�'I I FaPJaasinyd TrNuiy„ 11 S <br />Where the native soils are unable to meet the Hydraulic Conductivity <br />specification of 1X10-7 cm/sec, the native soils are proposed to be amended <br />with bentonite. Huddleston -Berry will complete a mix design to establish the <br />percentage of bentonite required to be blended into the native soils in order to <br />meet the Hydraulic Conductivity specification. Subsequently, the full suite of <br />testing outlined in the above table will be completed on the blended material <br />to be used for the liner construction. <br />E. Construction Materials Testing <br />1) Construction materials testing will be conducted by qualified engineering <br />technicians under the direction of the Field Testing Services Manager <br />and/or Project Engineer. <br />2) Prior to liner construction, the subgrade will be evaluated to ensure that it <br />is free of unsuitable materials. In addition, HBET will observe proofrolling <br />of the subgrade to ensure subgrade stability in accordance with <br />referenced Solid Waste Guidance Document. Subsequent to proofrolling, <br />but prior to liner placement, HBET will verify that subgrade properly <br />scarified. <br />3) In accordance with the referenced Solid Waste Guidance Document, <br />materials testing during liner construction will be conducted as <br />summarized in the following tables : <br />TABLE 2 <br />Pond #1 <br />Liner Volume <1,000 yd <br />Testing <br />Test Method <br />Required <br />Required # of <br />Frequency per <br />Tests for <br />Guidance <br />Compliance <br />Document <br />Water Content (Nuke <br />ASTM D6938 <br />4 per acre per lift <br />8 <br />Gauge) <br />Water Content (oven <br />ASTM D2216 <br />1 per 2.5 acres <br />1 <br />dried) <br />Density (Nuke Gauge) <br />ASTM D6938 <br />4 per acre per lift <br />8 <br />Density (Laboratory) <br />ASTM D1587 <br />1 per 2.5 acres <br />1 <br />Atterberg Limits <br />ASTM D4318 <br />1 per 1,000 yd <br />1 <br />Appendix U 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.