My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-03_PERMIT FILE - C1980004 (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2017-02-03_PERMIT FILE - C1980004 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 9:04:09 AM
Creation date
7/13/2017 9:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Permit File
Doc Date
2/3/2017
Section_Exhibit Name
Appendix U Construction Quality Assurance Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM Colorado <br />#00489-0002 <br />01/06/12 <br />j; Huddleston -Berry <br />f^P.�^�my,� Tret,nY•., � � <br />Fines Content <br />(Hydrometer) <br />ASTM D1140 <br />1 per 1,000 yd <br />1 <br />Grain Size Distribution <br />ASTM D422 <br />1 per 1,000 yd <br />1 <br />1- Point Proctor <br />ASTM D698 <br />1 per day <br />5 (estimated) <br />Modified Line of <br />Optimums (single <br />Proctor) <br />ASTM D698 <br />1 per 5,000 yd <br />1 <br />Degree of Saturation <br />1 per 5,000 yd <br />1 <br />Hydraulic Conductivity <br />ASTM D5084 <br />1 per 20,000 yd <br />1 <br />Specific Gravity' <br />ASTM D854 <br />*See note 1 <br />*See note 1 <br />Line of Optimums2 <br />ASTM D698, <br />ASTM D1557 <br />*See note 2 <br />*See note 2 <br />' Specific Gravity will be determined during evaluation of borrow materials. <br />2 Line of Optimums will be determined during evaluation of borrow materials. <br />4) Reporting <br />a) Field compaction/moisture testing results will be reported to <br />contractor in the field. <br />b) Where testing indicates failing results, contractor will be directed <br />to re -work and re -compact materials until passing testing results <br />are obtained. <br />c) Final testing reports will be provided to contractor and client on <br />the Friday of the week after the testing is completed. <br />F. Project Close -Out <br />1) Upon completion of the liner construction, the Project Engineer will provide <br />a comprehensive CQA report to the client. The report will include: <br />a) Discussion of construction materials and methods. <br />b) Summary of materials testing. <br />c) Laboratory testing reports. <br />d) Field testing reports. <br />e) Plot of testing locations. <br />f) Statement by Project Engineer discussing conformance of liner <br />construction with design. <br />Appendix U 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.