Laserfiche WebLink
Borehole Worksheet Cont'd Task 0 TTT Page 112 of 128 <br />Truck Bed (volume) Basis: <br />Struck Volume: 35.00 I,CY <br />Heaped Volume: 46.50 LCY <br />Average Volume: 40.75 LCY <br />Adjusted Volume: 46.50 LCY <br />Final Trick Volume Based on Number of Loader Passes- 43.88 LCY <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 11.250 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" 95-100%) 0.975 <br />Adjusted Capacity: <br />111.969 LCY <br />Grade <br />Job Condition Corrections: <br />Site Altitude (ft.). 7100 feet <br />Velocity <br />(f m) <br />[2983 <br />Travel Time <br />(min) <br />Truck Loader Source <br />21120.00 <br />0.00 <br />Altitude Adj: <br />1.000 1.000 (CAT HB) <br />7.643 <br />Job Efficiencv: <br />0.830 0.830 (CAT HB) <br />Net Correction: 1 <br />0.830 0.830 <br />Loading Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill Trick <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value <br />within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (mm.): <br />Load- NA <br />Maneuver. NA <br />Dump: 0.100 <br />Wheel and Track <br />Loaders - Unadjusted Basic Loader Cycle Time (load, dunip, maneuver). <br />Cycle Time Factors <br />Factor (min.) <br />Material- <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />Stockpile- <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />Truck Ownership- <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />Operation: <br />Constant operation -0.04 <br />4040 <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Net Cycle Time Adjustment: <br />-0070 <br />Adjusted Loader Cycle Time. <br />0.530 <br />Net Load Time per Truck: <br />1.690 <br />Truck Cycle Time: <br />Trick Exchange Time - <br />Trick Load Time: <br />Druck Maneuver and Dump l'ime- <br />Truck Travel (Haul & Return) Tone: <br />Haul Route. <br />0.600 <br />4 passes <br />minutes <br />Source <br />Cat HB) <br />Cat HB) <br />Cat HB) <br />Cat HB) <br />minutes <br />minutes <br />070 Minutes Adjusted for site altitude: 0 700 Minut <br />1 690 Minutes Adjusted for site altitude: 1 690 Minul <br />1.10 Minutes Adjusted for site altitude: 1 100 Minut <br />Road Condition. Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />(%) <br />'total Res <br />(%) <br />Velocity <br />(f m) <br />[2983 <br />Travel Time <br />(min) <br />1 <br />21120.00 <br />0.00 <br />3.00 <br />3.00 <br />7.643 <br />Haul Time. 7.643 minutes <br />CIRCES Cost Estunating Software <br />