Laserfiche WebLink
Borehole Worksheet Cont'd Task t# TTT Page 111 of 128 <br />Task description: <br />Site: Bowie No. 1 Mine <br />TRUCK/LOADER TEAM WORK <br />Haul Footprint of Loadout Stockpiles to Refuse Area <br />Permit Action: Bond Release 5 (SL -5) Pennit/Job#• C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 204 State: Colorado Abbreviation: None <br />Date: 214/2015 County: Delta Filename: C039-204 <br />User. SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: leer day <br />Equipment Description <br />Truck Loader Team -Truck: 1 Cat 773F <br />-Loader: F77AT 990H <br />Support Equipment -Load Area- Cat D10T - IOSU <br />-Dump Area: Cat DIOT - IOSU <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck. Water Tanker, 5,000 Gal. <br />rnet Rra9L-dnwnr Tnirk/T nwipr TPam Snnnnrt Fnumment Maintenance Fonintnent <br />Total work team cost/hour: $1,976.19 <br />MATERIAL QUANTITIES <br />Initial volume: 1,613 CCY <br />Loose volume: 2,210 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor: Division Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.370 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis - <br />Material weight: 2,300 Pounds/LCY <br />Description. User Provided <br />Rated Payload: 122,520 Pounds <br />Payload Capacity: 53.27 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />65 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$65.23 <br />$129.39 <br />S12017 <br />$120 17 <br />$4203 <br />$20.53 <br />Operating cost/hour: <br />$124.51 <br />$108.36 <br />$184.48 <br />$184.48 <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$27.80 <br />$37.13 <br />$38.01 <br />538.01 <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$217.54 <br />$274.88 <br />$342.65 <br />$342.65 <br />$101.43 <br />1 $44.42 <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 1 <br />Group Subtotals: <br />Work: <br />$1,145.04 <br />Support: <br />5685.30 <br />Mamt: <br />$14585 <br />Total work team cost/hour: $1,976.19 <br />MATERIAL QUANTITIES <br />Initial volume: 1,613 CCY <br />Loose volume: 2,210 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor: Division Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.370 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis - <br />Material weight: 2,300 Pounds/LCY <br />Description. User Provided <br />Rated Payload: 122,520 Pounds <br />Payload Capacity: 53.27 LCY <br />CIRCES Cost Estimating Software <br />