Laserfiche WebLink
Borehole Worksheet Cont'd <br />Task g TTT <br />Page 110 of 128 <br />Pump House at <br />16280 cf <br />Bldg. (MN) demo./on- <br />16,280.00 <br />CF <br />$0.21 <br />$3,483.92 <br />Loadout <br />site disposal in <br />Superstructure <br />excavated pit - Max. <br />200 ft. push <br />Pomp House at <br />813 sgtt <br />Demo, and on-site <br />813.00 <br />SF <br />$2.91 <br />$2,36583 <br />Loadout Slab <br />disposal in excavated <br />pit, 10 in thick -Max. <br />200 ft. push <br />Pump House at <br />1944 sqft <br />Demo. and on-site <br />1,94400 <br />SF <br />$3.77 <br />$7,323.05 <br />Loadout Walls <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />Railroad Track <br />7088 If <br />Railroad track - Ties <br />7,088.00 <br />LF <br />$9.01 <br />$63,862.88 <br />and track <br />Railroad Track <br />1590 cy <br />Railroad track - Ballast <br />1,590.00 <br />CY <br />$4.45 <br />$7,075.50 <br />Ballas <br />edge Reclamation <br />11 bridge <br />USER PROVIDED::— <br />1.00 <br />ea <br />$156,669.00 <br />6,669.00 <br />(Adjusted Cyprus <br />ITEM <br />Estimate <br />a on Fuel <br />500 gal <br />Hazardous waste <br />200 <br />DRUM <br />$335.51 <br />Tank (2) <br />removal - Drtuu <br />solids/liquids, per <br />drum, (7T drum job) <br />500 Gallon Fuel <br />500 gal <br />Remove sludge, water, <br />200 <br />EA <br />$22950 <br />$45900 <br />Tank (2) Remove <br />and rem. product from <br />Sludge <br />tank - 3,000 to 5,000 <br />al. <br />500 Gallon Fuel <br />100 gal <br />Dispose of tank sludge <br />100.00 <br />GAL <br />$6.25 <br />$625.00 <br />Tank (2) Disposal of <br />out' -site - Average <br />SludRe_ <br />15 lbs <br />Insert dry ice (CO2) <br />LB <br />$1.81 <br />$27.15 <br />500 Gallon Fuel <br />15.00 <br />Tank (2) Add CO2 <br />into tank to produce <br />for Tank Cleaning <br />inert gas - 1.5 lbs./100 <br />al. <br />500 Gallon Fuel <br />2 tanks <br />Haul tank to certified <br />200 <br />EA <br />$760.00 <br />$1,520.00 <br />Tank (2) Haul Tanks <br />salvage dump - 3,000 to <br />to Certified Dump <br />5,000 gal. tank <br />Concrete Disposal <br />1911 CY <br />Loading and 5 mile <br />1,91100 <br />CY <br />$11 17 <br />$21,345.87 <br />Charges <br />haul, salvage allowed - <br />Concrete frame <br />structures <br />Culvert Removal - <br />24 inches <br />Pipe, corrugated metal <br />934.00 <br />LF <br />$3.26 <br />$3,044.84 <br />24" Culvert <br />(CMP) - 24 in. <br />36 inches <br />diameter pipe <br />Culvert Removal - <br />Pipe, corrugated metal <br />36.00 <br />LF <br />$4.97 <br />$178.92 <br />36" Culvert <br />(CMP) - 36 in. <br />diameter pipe <br />Culvert Removal - <br />60 inches <br />Pipe, corrugated metal <br />465.00 <br />LF <br />$13.30 <br />$6,184.50 <br />60" Culvert <br />(CMP) - 60 in. <br />diameter pipe <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 175.00 (unadjusted): $509,971.52 location): $500,792.03 <br />CIRCES Cost Estimatmg Soft -are <br />