My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-02_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2017-06-02_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2017 9:30:44 AM
Creation date
7/6/2017 9:29:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
6/2/2017
Doc Name
Follow up Questions
From
Judy Martin
To
DRMS
Type & Sequence
PR5
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task 4 TTT Page 109 of 128 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in thick - Max <br />200 fl push <br />Coal Storage Silos <br />11545 sqft <br />Floor, concrete, <br />11,545.00 <br />SF <br />$3.24 <br />$37,405.80 <br />Superstructure Slab <br />demolition only, <br />average reinforcing - 12 <br />in. thick <br />Coal Storage Silos <br />89 Cy <br />Demo. and on-site <br />89.00 <br />LF <br />$2096 <br />$1,865.44 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft push <br />MCC at Silo <br />504 sqft <br />Demo. and on-site <br />504.00 <br />SF <br />$2.91 <br />$1,466.64 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick - Max. <br />200 tt. push <br />Substation <br />291 sqft <br />Demo. and on-site <br />291.00 <br />SF <br />52.91 <br />$846.81 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick - Max. <br />200 ft. push <br />Substation <br />1681f <br />Demo. and on-site <br />168.00 <br />LF <br />$20.96 <br />$3,521.28 <br />Superstructure <br />disposal in excavated <br />Footing <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />Shop Building <br />150000 cf <br />Bldg. (SN) demo./on- <br />150,000 00 <br />CF <br />SO 19 <br />$28,350.00 <br />Superstructure <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />Shop Building <br />5420 sqft <br />Demo. and on-site <br />5,420.00 <br />SF <br />$2.86 <br />$15,501.20 <br />Superstructure Slab <br />disposal in existing pit, <br />10 in. thick - Max 200 <br />ft. push <br />Shop Building <br />3001f <br />Demo. and on-site <br />300.00 <br />LF <br />_$2096 <br />S6,288.00 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft push <br />Pump House at Silo <br />1164 sqft <br />Demo. and on-site <br />1,164.00 <br />SF <br />$2.91 <br />$3,387,24 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in thick -Max. <br />200 ft push <br />672.00 <br />SF <br />$2.91 <br />$1,955.52 <br />MCC at Loadout <br />672 sqft <br />Demo. and on-site <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick - Max. <br />200 ft. push <br />Misc Fencing <br />28001f <br />Fencing, chain link, <br />2,800.00 <br />LF <br />$2.98 <br />$8,344.00 <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />hi h <br />Train Loadout <br />900 sqft <br />Demo, and on-site <br />900.00 <br />SF <br />$2.91 <br />$2,619.00 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in thick - Max. <br />200 ft. push <br />Train Loadout <br />1201f <br />Demo. and on-site <br />120.00 <br />LF <br />520.96 <br />$2,515.20 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />Train Loadout <br />1201f <br />Fencing, chain link, <br />120.00 <br />LF <br />52.98 <br />$357.60 <br />Superstructure Fence <br />including posts and <br />fabric - 8 ft. to 10 ft <br />hi h <br />CIRCES Cost Estunating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.