Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 113 of 128 <br />Return Rnnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll Res <br />(% <br />Total Res <br />(%) <br />Velocity <br />(fP111) <br />Travel Time <br />(min) <br />1 <br />21120.00 <br />0.00 <br />3.00 <br />1 3.00 <br />1 3569 <br />6.131 <br />Return Time: 6.131 <br />Total Truck Cycle Time: 17,264 <br />Loading Tool unit <br />Production 1,101.46 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />152.48 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks- 7 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production- 506.25 <br />Adjusted single truck/loader team production: 506.25 <br />Adjusted multiple truck/loader team production: 506.25 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost S3.904 /LCY <br />minutes <br />minutes <br />914.22 LCY/Hour <br />126.56 LCY/Hour <br />4 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 4.37 Hours <br />Total job cost: $8,626 <br />CTRCES Cost Estimating Software <br />