areas. This material will be inert backfill, and notification of the Division will take place in <br />accordance with Rule 3.1.5(9). <br />cZEX <br />Once topsoil is placed, it will be disked or harrowed prior to seeding. <br />3. Haul Roads and Access <br />The access to 1-76 and County Roads 23 and 24 will remain in place as primary access to the <br />property. <br />4. Reclamation Timetable <br />Reclamation of the Ayers Pit will take place on the estimated timeline shown in Table E-2 <br />below. This timeline is based on the mine life and timetable in Exhibit D. <br />Table E-2 Reclamation Timetable <br />Activity <br />Time to Complete <br />Regrading existing highwall to 3HAV <br />0.5 year <br />Mining Dune sands and Alluvial cobbles <br />2-4 years <br />Regrade remaining slopes to 3HAV <br />0.5 year <br />Topsoil and revegetated disturbed areas <br />0.5 year <br />Total <br />5-6 years <br />5. Revegetation Plan <br />Following the placement of topsoil, seeding of native species will take place in the next <br />appropriate planting season. This will either be in the spring (March 15 -April 15) or in the fall <br />(September 15 -November 15). The topsoil will be disked or harrowed in advance of seed <br />application. <br />Table E-3 shows the seed mix and seeding rates that will be applied at the Ayers Pit. <br />Byers Pit DL'Cc'mber 2016 E-? �/ (:� i c,.ickl a.d Asaocixld PLI [' <br />