Laserfiche WebLink
EXHIBIT L WORST CASE RECLAMATION SCENARIO <br />Due to the short mine life of the Ayers Pit (2-5 years) bonding estimates reflect the reclamation <br />scenario that is feasible for implementation in the reasonably near term. Therefore, for the purposes <br />of this section, the reclamation plan that the bond will be based on is similar to that shown on Map <br />P. This is when mining has been completed. This is roughly 5.0 acres of disturbed area that will <br />require topsoiling and seeding. It is expected to take 2-5 years to reach this point. <br />The worst case reclamation tasks are outlined below. <br />1. Regrade highwall to final slopes. 24,889 CY ;a' $0.18iCY = $4,480 <br />2. Place topsoil on all disturbed areas (5.0 acres) to a depth of 8 inches. 5400 CY ori:' $0.85 to <br />haul and place $4,590 <br />3. Remove all facilities and equipment. $0 (all equipment is mobile) <br />4. Reveg all disturbed areas. 5.0 acres = $8,708 <br />5. Mobilization = $4,874 <br />Based on these inputs, and an indirect cost for DRMS of $5,373, the total bond cost should be <br />roughly $28,025 <br />Ayers Pit December 2016 L-1 G 1-1,kkiandAweeU. hilt_ <br />