Laserfiche WebLink
June 14, 2017 C-1981-018/Deserado Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br />Pond RP-1 was dry at the time of the inspection. Embankments were stable and well vegetated at the time of the <br />inspection. The primary and emergency spillways were in compliance with no problems noted. <br />Pond RP-2/3 was impounding water in the upper cells and the lower cell at the time of the inspection. No <br />discharge was noted. The embankments were stable and well vegetated at the time of the inspection. <br />Pond RP-4 was dry with no evidence of recent discharge at the time of the inspection. The pond embankments <br />were stable. No problems were noted with the spillways at the time of the inspection. <br />Pond RP-5a was dry at the time of the inspection. The combination primary/emergency spillway found to be in <br />compliance with no problems noted. The embankments were well vegetated and stable. <br />Pond RR-1 was dry at the time of the inspection. Embankments were stable with no problems noted. Primary <br />riser and emergency spillway found to be in compliance. <br />Pond SS-1 was observed from the Slot Storage pad and was dry, with no discharge at the time of the inspection. <br />Embankments appeared stable and well vegetated with no signs of damage. <br />Pond SS-2 was dry at the time of the inspection. No problems were noted. Embankments appeared stable with <br />good vegetation throughout. Due to wild fire fighting efforts, aerial fire retardant was within the pond. <br /> Pond RP-2/3 <br /> Pond RP-4 Pond RP-5 <br />