My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-20_INSPECTION - C1992081
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1992081
>
2017-06-20_INSPECTION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2017 6:14:44 AM
Creation date
6/21/2017 6:52:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Inspection
Doc Date
6/20/2017
Doc Name
Inspection Report
From
DRMS
To
Hayden Gulch Terminal, LLC
Inspection Date
6/15/2017
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 15, 2017 C-1992-081/Hayden Gulch Loadout JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 6 <br /> <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage – Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> <br />The truck loop pond was holding water with no discharge noted through the primary CMP spillway and the valve <br />on the spillway was closed. The embankments were well vegetated and stable with no problems noted. The Rail <br />Loop Pond was dry at the time of the inspection, with no evidence of recent discharge noted. Embankments were <br />stable and well vegetated with no problems noted. <br /> Truck Loop Pond Rail Loop Pond <br /> <br />Ditches and culverts throughout the Loadout area and the Tie-Across Haul Road were stable and no problems <br />noted. As noted in the Backfill and Grading portion of this report, ditch 7, ditch 8, and a portion of ditch 3 have <br />been re-established. These ditches now flow to the rail loop pond and the material pushed into the ditches have <br />been cleared. This maintenance item has been adequately addressed. <br /> Re-established Ditches 7, 8 and 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.