Laserfiche WebLink
June 15, 2017 C-1992-081/Hayden Gulch Loadout JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 4 of 6 <br /> <br />In addition, culvert RRC-1 was observed during the April 2017 partial inspection as being no longer in place or no <br />longer functioning as designed. A small amount of flow was noted under the rail bed; however, this flow was not <br />substantial and water has been impounded on the east side of the rail bed with no relief provided by the RRC-1 <br />culvert. The RRC-1 culvert is designed to be 45 feet in length and 18 inches in diameter (Table 12-2). The culvert <br />has been replaced as designed. This maintenance item has been adequately addressed. <br /> Replaced Culvert RRC-1 with Positive Flow <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The tie-across haul road was stable and dry with no problems noted. <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />