Laserfiche WebLink
Temporary Facility Pond. Silt fence and Topsoil Pile 29A containment berm. <br />Wilson Storage Pond construction. <br />GENERAL MINE PLAN COMPLIANCE: <br />The temporary facility area for the construction of the Collom Haul Road has been completed. Multiple office <br />trailers have been placed on sight as well designated areas for parking and equipment storage. All disturbances <br />drain into the completed Temporary Facilities Pond and associated ditches. No erosion was present within the <br />area. <br />The water pipeline from the Wilson Reservoir to the Collom facility area was being constructed. The line was <br />currently being constructed just west of County Road 51. <br />Multiple biologists and archeologists were present during the construction activities. <br />