Laserfiche WebLink
600 <br /> 4031-14 Injection Well Drilling and Completion Information 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0"conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 lb/ft), cement to surface 77800 <br /> 132.8'-1466.4' MD KB; 120.0'-1453.6' MD GL: directional drill 9.50"vertical intermediate hole to KOP <br /> East 1466.4'-2294.5' MD KB; 1453.6'-2281.7' MD GL: directional drill 9.50"curve portion intermediate hole, average 10.90 per 100 ft West 900 <br /> 0.0'-2294.5' MD KB; 0.0'-2281.7' MD GL: install 7.0" OD x 6.366" ID intermediate casing (J-55, 23.0 lb/ft), Centek centralizers every 80-100 ft <br /> 0.0'-2294.5' MD KB; 0.0'-2281.7' MD GL: cement intermediate casing, Portland Type 1/11 1000 <br /> 2294.5'-5240.3'MD KB; 2281.T-5227.5' MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 1' above base of UBB <br /> Production Casing (using packer) <br /> 1100 <br /> 0.0'-2083.1'MD KB; 0.0'-2070.3' MD GL: install 4.5" x 4.0" ID production casing (J-55, 11.4 lb/ft); install annular packer at 2070.3 MD GL(DS) <br /> 2083.1'-5240.3' MD KB; 2070.3'-5227.5' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 Ib/ft)to TD KB:6712.8',est <br /> GL:6700.0',est 1200 Me <br /> Production Casing (using hanger) Depth GLpth GIL <br /> 2083.1'-5240.3' MD KB; 2070.3'-5227.5' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 lb/ft); install hanger at 2070.3 MD GL(DS) <br /> Kick-Off Point 1300 <br /> 1466.4 MD KB <br /> 1453.6 MD GL <br /> 1400 <br /> Intermediate Hole Drill Path <br /> 9.50"dia., 10.9°/100'Build Rate <br /> 132.8-2294.5 MD KB <br /> 120.0-2281.7 MD GL <br /> Production Casing(using packer) <br /> TD in Lower UBB 1500 <br /> 4.5"OD x 4.0" ID,J-55 <br /> 0.0-2083.1 MD KB <br /> 0.0-2070.3 MD GL 7.0"x 4.5"Annular Packer 760 <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel or 7.0"x 4.5" Heavy Duty Casing Hanger ° <br /> 2083.1-5240.3 MD KB Production Hole Drill Path -2083.1 MD KB <br /> 6.125"dia. Directional Hole Intermediate Casing -2070.3 MD GL <br /> 2070.3-5227.5 MD GL 2294.5-5240.3 MD KB 7.0"OD x 6.366" ID;J-55, 23.0 Ib/ft <br /> Install at DS >>oo <br /> 2281.7-5227.5 MD GL 6.241" Drfit;7.875"Coupling OD <br /> Production Casing (using hanger) Maintain Drill Path 'I'Above Base of UBB 0-2294.5 MD KB <br /> TD: 5240.3 MD KB,approx. 4.5"OD x 4.0" -55, FJ Steel <br /> TD: 5227.5 MD GL,approx. ID,J 2083 -50.3 MD KB 0-2281.7 MD GL <br /> 2070.3-5227.5 MD GL Land Casing in Lower UBB �eoo <br /> Projected 403H-R Pass-by <br /> 2446.9 MD KB <br /> 2434.1 MD GL 1yo <br /> 0 <br /> ago Top of OSMB <br /> cNo a� <br /> CNO V C'Jli A N �O <br /> CD O O O O O O O O O O O O O O CD CD <br /> O O CD CD O <br /> Natural Soda LLC <br /> 4031-1-1 Well Prognosis Schematic <br /> Section 25,T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc. � _ Date: March 8,2017 <br /> n <br />