Laserfiche WebLink
600 <br /> 403H-R Recovery Well Drilling and Completion Information 700 <br /> 0.0'-132.8' M D KB; 0.0'-120.0' M D GL: drill 24.0" conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: Option 1: install 16.0" OD x 15.124" ID conductor casing (J-55, 75.0 Ib/ft), cement to surface 800 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: Option 2: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 Ib/ft), cement to surface <br /> East 132.8'-1463.6' MD KB; 120.0'-1450.8' MD GL: directional drill intermediate hole to KOP, see options below West 900 <br /> 132.8'-2294.5' MD KB; 120.0'-2281.7' MD GL: Option 1 (16.0" conductor casing): drill 13.5" diameter intermediate hole, 10.8'/100' build rate <br /> 132.8'-2294.5' MD KB; 120.0'-2281.7' MD GL: Option 2 (13.375" conductor casing): drill 12.25"diameter intermediate hole, 10.8°/100' build rate 1000 <br /> 0.0'-2294.5' MD KB; 120.0'-2281.7' MD GL: install 9.625" OD x 8.835" ID intermediate casing (J-55, 40.0 Ib/ft), cement to surface <br /> 2294.5'-2385.8' MD KB; 2281.7'-2373.0' MD GL: directional drill 6.75" or 8.5" production hole to 403H-1 well pass-by, maintain drill path 2' above base of UBB <br /> 1100 <br /> KB: 6712.8', est <br /> GL: 6700.0',est Measured <br /> 120o Depth GL <br /> Kick-Off Point 1300 <br /> 1463.6 MD KB <br /> 1450.8 MD GL <br /> Intermediate Hole (13.375" Conductor Casing) 1400 <br /> 12.25"dia., 10.8°/100'Build Rate <br /> Intermediate Hole (16.0" Conductor Casing) <br /> 13.5"dia., 10.8°/100' Build Rate <br /> 132.8-2294.5 MD KB 1500 <br /> 120.0-2281.7 MD GL <br /> TD in Lower UBB <br /> k <br /> 1600 <br /> Intermediate Casing <br /> 9,625"OD x 8.835" iD;J-55,40.0 Ib/ft <br /> 8.679"drift; 10.925"Coupling OD 71100 <br /> 0-2294.5 MD KB <br /> Production Hole 0-2281.7 MD GL <br /> 6.750"dia. or 8.5"dia. Land Casing in Lower UBB <br /> (Injection Well Pass-By) 'e00 <br /> 2385.8 MD KB <br /> 2373.0 MD GL <br /> 10 <br /> 00 <br /> Top of OSMB <br /> 0 <br /> N a� <br /> C, N O <br /> O <br /> O <br /> Natural Soda LLC <br /> 403H-R Well Prognosis Schematic <br /> Section 25,T1S, R98W Rio Blanco County, CO <br /> Daub&Assodates,Inc. - , <br /> :�,^ R, _� �� Date: March 23,2017 <br />