My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-23_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2017-05-23_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:27 PM
Creation date
5/24/2017 1:27:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/23/2017
Doc Name
Application
From
Natural Soda LLC
To
DRMS
Type & Sequence
AM4
Email Name
THM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 <br /> 4011-1-1 Option 2 Injection Well Drilling and Completion Information <br /> 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0'MD GL: drill 24.0" conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375" OD x 12.715" ID conductor casing (J-55,48.0 lb/ft), cement to surface 800 <br /> 132.8'-1357.4'MD KB; 120.0'-1344.6' MD GL: directional drill 9.50"vertical intermediate hole to KOP <br /> East 1357.4'-2257.5' MD KB; 1344.6'-2244.7'MD GL: directional drill 9.50" curve portion intermediate hole, average 10.00 per 100 ft 900 <br /> West <br /> 0.0'-2257.5' MD KB; 0.0'-2244.7' MD GL: install 7.0" OD x 6.366" ID intermediate casing (J-55, 23.0 lb/ft), Centek centralizers every 80-100 ft <br /> 0.0'-2257.5'MD KB; 0.0'-2244.7' MD GL: cement intermediate casing, Portland Type 1/11 <br /> l000 <br /> 2257.5'-4715.4' MD KB; 2244.7'-4702.6'MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 1' above base of UBB <br /> Production Casing (using packer) <br /> 0.0'-2022.5' MD KB; 0.0'-2009.7' MD GL: install 4.5" x 4.0" ID production casing (J-55, 11.4 lb/ft); install annular packer at 2009.7 MD GL (DS) KB:6694.8',est 1100 <br /> GL:6682.0',est <br /> 2022.5'-4715.4' MD KB; 2009.7'4702.6' MD GL: install 4.5"x 4.0" ID FJ production casing (J-55, 11.4 lb/ft)to TD <br /> Production Casing (using hanger) 1200 Measured <br /> ( g 9 ) Depth GL <br /> 2022.5'-4715.4' MD KB; 2009.7'.4702.6'MD GL: install 4.5" x 4.0" ID FJ production casing (JS5, 11.4 lb/ft); install hanger at 2009.7 MD GL(DS) Kick-Off Point <br /> 1357.4 MD KB <br /> 1344.6 MD GL 1300 <br /> Intermediate Hole Drill Path <br /> 9.50"dia., 10.0'/100'Build Rate <br /> 132.8-2257.5 MD KB 1400 <br /> 120.0-2244.7 MD GL <br /> TD in Lower UBB <br /> Production Casing (using packer) <br /> 4.5"OD x 4.0" ID,J-55 <br /> 0.0-2022.5 MD KB 7.0"x 4.5"Annular Packer 1500 <br /> 0.0-2009.7 MD GL or 7.0"x 4.5"Heavy Duty Casing Hanger <br /> 4.5"OD x 4.0" ID, J-55, FJ Steel Production Hole Drill Path Intermediate Casing -2022.5 MD MD GB 2022.5-4715.4 MD KB 6.125"dia. Directional Hole g 76 <br /> 2009.7-4702.6 MD GL 7.0"OD x 6.366" ID;J-55,23.0 Ib/ft Install at DS 00 <br /> 2257.5-4715.4 MD KB 6.241"Drfit;7.875"Coupling OD <br /> Production Casing (using hanger) 2244.7-4702.6 MD GL 0-2257.5 MD KB <br /> 0-2244.7 MD GL <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel Maintain Drill Path 1'Above Base of UBB �100 <br /> 2022.5-4715.4 MD KB Land Casing in Lower UBB <br /> TD:4715.4 MD KB,approx. 2009.7-4702.E MD GL Projected 401H-R Pass-by <br /> TD:4702.6 MD GL, approx. 2374.0 MD KB Boo <br /> f- <br /> 2361.2 MD GL <br /> Top of OSMB <br /> 0 <br /> W W W N W W OD V 0) O A W <br /> O O OD O CA O C p O O CD O O O O O CD N p <br /> O O O O O <br /> � C O <br /> Natural Soda LLC <br /> 401 H-1 Opt 2 Well Prognosis Schematic <br /> Section 26,T1S, R98W Rio Blanco County, CO <br /> Daub&Aswdates,Inc.,_�1VF1 <br /> Date: March 13,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.