My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-23_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2017-05-23_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:27 PM
Creation date
5/24/2017 1:27:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
5/23/2017
Doc Name
Application
From
Natural Soda LLC
To
DRMS
Type & Sequence
AM4
Email Name
THM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 <br /> 4011-1-1 Injection Well Drilling and Completion Information 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0" conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 lb/ft), cement to surface 800 <br /> 132.8'-1443.9' MD KB; 120.0'-1431.1' MD GL: directional drill 9.50"vertical intermediate hole to KOP <br /> West 1443.9'-2301.1' MD KB; 1431.1'-2288.3' MD GL: directional drill 9.50"curve portion intermediate hole, average 10.50 per 100 ft East 900 <br /> 0.0'-2301.1'MD KB; 0.0'-2288.3'MD GL: install 7.0" OD x 6.366" ID intermediate casing (J-55, 23.0 lb/ft), Centek centralizers every 80-100 ft <br /> 0.0'-2301.1' MD KB; 0.0'-2288.3' MD GL: cement intermediate casing, Portland Type 1/11 1000 <br /> 2301.1'-5480.1' MD KB; 2288.3'-5467.3' MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 1' above base of UBB <br /> Production Casing (using packer) <br /> 1100 <br /> 0.0'-2082.2' MD KB; 0.0'-2069.4' MD GL: install 4.5"x 4.0" ID production casing (J-55, 11.4 lb/ft); install annular packer at 2069.4 MD GL(DS) <br /> 2082.2'-5480.1' MD KB; 2069.4'-5467.T MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 Ib/ft)to TD KB:6712.8',est <br /> GL: 6700.0',est 1200 Me <br /> Production Casing (using hanger) Depth GL <br /> GGL <br /> 2082.2'-5480.1' MD KB; 2069.4'-5467.3' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 lb/ft); install hanger at 2069.4 MD GL (DS) <br /> Kick-Off Point 1300 <br /> 1443.9 MD KB <br /> 1431.1 MD GL <br /> Intermediate Hole Drill Path 1400 <br /> 9.50"dia., 10.5°/100'Build Rate <br /> 132.8-2301.1 MD KB <br /> 120.0-2288.3 MD GL <br /> Production Casing(using packer) TD in Lower UBB 1500 <br /> 4.5"OD x 4.0" ID, J-55 <br /> 0.0-2082.2 MD KB 7.0"x 4.5"Annular Packer <br /> 0.0-2069.4 MD GL or 7.0"x 4.5" Heavy Duty Casing Hanger <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel Production Hole Drill Path -2082.2 MD KB 1600 <br /> 2082.2-5480.1 MD KB 6.125"dia. Directional Hole Intermediate Casing -2069.4 MD GL <br /> 2069.4-5467.3 MD GL 2301.1-5480.1 MD KB 7.0"OD x 6.366" ID;J-55,23.0 lb/ft Install at DS <br /> 2288.3-5467.3 MD GL 6.241" Drfit;7.875"Coupling OD <br /> Production Casing(using hanger) Maintain Drill Path 'I'Above Base of UBB 0-2301.1 MD KB 1,100 <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel 0-2288.3 MD GL <br /> 2082.2-5480.1 MD KB Land Casing in Lower UBB <br /> TD: 5480.1 MD KB, approx. 2069.4-5467.3 MD GL <br /> TD:5467.3 MD GL,approx. Projected 401H-R Pass-by e00 <br /> � 2499.E MD KB <br /> 2486.8 MD GL <br /> .10 <br /> 00 <br /> a�0 Top of OSMB <br /> ? A NO O O O O O p <br /> PQ <br /> N'O <br /> .... <br /> O O CDO O O O O O p O C 0 O <br /> Natural Soda LLC <br /> 401 H-1 Opt 1 Well Prognosis Schematic <br /> Section 25,TT11S`, R98W Rio Blanco County, CO <br /> Daub&Associates,I? "S `�^�g <br /> Date: March 23,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.