My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-09_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2017-05-09_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 7:36:49 AM
Creation date
5/10/2017 6:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
5/9/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
TR72
Email Name
RDZ
JRS
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 13 <br />BULLDOZER WORK <br />Task description: Regrade Access Roadto NW Vent Shaft <br />Site: New Hk Mne Perinit Action: Technical Revision 72 Permit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task#: A02 State: Colorado Abbreviation: None <br />Date: 5/9/2017 County: Las Animas Filename: C012 -A02 <br />Us er: CCW <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-s hank ripp er <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />$83.81 <br />Utilization % <br />NA <br />$66.17 <br />100 <br />$7.55 <br />NA <br />$1.08 <br />15 <br />$41.85 <br />NA <br />Totalunit Cost/flour: $200.46 <br />Total Fleet Cost/Hour: $200.46 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,111 <br />Swell factor: 1.165 <br />Loosevolume: 1,294 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />50 feet <br />1,400.0 LCY/hr <br />-5% <br />7,300 feet <br />Compacted fill or embankment 0.9 <br />Material weight: 2,900 lbs /LCY <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.