My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-09_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2017-05-09_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 7:36:49 AM
Creation date
5/10/2017 6:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
5/9/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
TR72
Email Name
RDZ
JRS
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weight description: Decompo <br />sed rock - 50% Rock, <br />50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG) <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />(AVG) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.115 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material W eight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3963 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />554.82 L.CY/hr <br />554.82 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.361/LCY <br />Totaljob time: 2.33 Hours <br />Totaljob cost: $468 <br />Page 7 of 13 <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.