Laserfiche WebLink
Page 5 of 13 <br />Haul Route: <br />Seg # Haul Distance <br />Grade (%) Roll. Res <br />TotalRes <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />��� <br />1 500.00 <br />8.00 5.00 <br />13.00 <br />834 <br />0.607 <br />2 250.00 <br />6.00 5.00 <br />11.00 <br />1018 <br />0.247 <br />HaulTime: 0.854 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) Roll. Res <br />TotalRes <br />Velocity <br />Travel <br />Total Truck Cycle Time: 3.479 <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Production <br />404.08 <br />LCY/Hour Adjusted forjob efficiency: <br />335.39 LCY/Hour <br />TruckUnit Production <br />min <br />1 <br />250.00 <br />-6.00 5.00 <br />-1.00 <br />2938 <br />0.127 <br />2 <br />500.00 <br />-8.00 5.00 <br />-3.00 <br />2938 <br />0.228 <br />CIRCES Cost Estimating Solware <br />Return Time: 0.355 <br />minutes <br />Total Truck Cycle Time: 3.479 <br />minutes <br />Loading Tool unit <br />Production <br />404.08 <br />LCY/Hour Adjusted forjob efficiency: <br />335.39 LCY/Hour <br />TruckUnit Production <br />170.74 <br />LCY/Hour Adjusted forjob efficiency: <br />141.71 LCY/Hour <br />Optimal No. ofTrucks: <br />2 <br />Truck(s) Selected NumberofTrucks: <br />1 Truck(s) <br />Adjustedhourly truck teamproduction: 141.71 <br />LCY/Hour <br />Adjusted single truck/loaderteamproduction: 141.71 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 141.71 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Totaljob time: 5.95 <br />Hours <br />Unit cost: <br />$2.271 <br />/LCY Totaljob cost: $1,915 <br />CIRCES Cost Estimating Solware <br />