Laserfiche WebLink
Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude <br />Truck Load Time: 0.970 Minutes Adjusted for site altitude <br />Page 4 of 13 <br />0.500 Minutes <br />0.970 Minutes <br />TruckManeuverand Dump 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />CIRCES Cost Estimating So$ware <br />