Laserfiche WebLink
March 29, 2017 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 6 of 15 <br /> <br /> <br />9E Utility Borehole <br /> <br />18L ventilation pad and pond area is currently decommission. Per TC may be utilized again while mining the wolf <br />creek reserve. The mine entrance sign off Country Rd 27 was correct and in place. The topsoil pile was well <br />vegetated and stable. <br /> <br /> <br />18L pond, holding water but not discharging <br /> <br />16L pad: There is nothing on this pad. The banks were hydro-seeded last fall. Topsoil pile was stable and well <br />vegetated. <br /> <br />Old Middle Creek Warehouse storage area was observed, sign was in place, no issues were noted. <br /> <br />BOB pile is relatively small as washing is currently to minimum due to current issues finding a suitable location to <br />pump the thickener underflow. At the time of inspection the Sandstone Sub Thickener Underflow borehole and <br />pipeline were in the process of being installed as a temporary pumping location (approved with MR 303). The