Laserfiche WebLink
March 29, 2017 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 7 of 15 <br /> <br />pipeline is above ground and composed of double walled HDPE with moisture sensors and walked once a shift to <br />detect any leaks. The pipeline will be buried upon the completion of the Divisions review of TR87. The mine has <br />re-excavated the incised holding basin adjacent to the Area 1 pit to provide a buffer for temporary placement of <br />underflow slurry. This basin was holding slurry at the time of inspection. <br /> <br /> <br />Incised basin adjacent to Area 1 pit holding underflow slurry. <br /> <br />The explosives storage area was observed with no problems noted. <br /> <br />The rock dust Tank north of the main facilities area was observed and no problems were noted. <br /> <br />The equipment laydown area southwest of Pond G was observed. TC has equipment close to topsoil stockpile SF- <br />16. TC should exercise caution so this topsoil pile is not disturbed. <br /> <br /> Bone yard/ Roller Storage drainage ditch has been reestablish but will need to be cleaned out in the <br />near future. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil piles on site appeared stable. <br />