Laserfiche WebLink
RECLAMATION PLAN EXHIBIT D <br />1. General Reclamation Plan <br />The total permit area is 12.5 acres. The amount of land that will be disturbed is 11.5 acres. The <br />undisturbed area within the permit is 1.0 acres. Reclamation will be conducted over all of the <br />mining area at once at the end of mining. All disturbed areas will be reclaimed as rangeland. See <br />Map E-3 for details. <br />2. Topsoil Replacement <br />The topsoil thickness is expected to range from 0-8 inches. During mining, the topsoil will be <br />stored in a berm along the west side of the site. See Map E-2. Soil will be replaced over the <br />entire mine site at once, due to the small size of the site. Topsoil thickness upon replacement is <br />expected to be six inches on average. <br />3. Haul Roads and Access <br />One access road will connect the forest service road to the pit. See Map E-3 for the layout of <br />roads after mining and reclamation. <br />4. Reclamation Timetable <br />See Exhibit E section 2. <br />Cottonwood Pass 2/28/2017 D-1 Greg It'Kki and Associates, FUA' <br />