Laserfiche WebLink
5. Revegetation Plan <br />All areas will be harrowed and drill seeded after topsoil placement with a seed mix consisting of <br />the following to control erosion: <br />Below timberline (11,750') <br />Live seed per Ib % of Mix PLS per Acre <br />Above timberline (11,750') <br />Species <br />:1,500,000 <br />....... ...,.,...... , <br />Deschampsia cespitosa� <br />Festuca saximontana <br />10 <br />0.348. <br />0.563 <br />Achillea millefoilium <br />2,700,000 <br />2,500,000 <br />1 <br />0.019 <br />Bice Imft {fftt€d,:.. __ ._......:° .:.............:.',,..`.:.......:....w.. <br />_,.,., <br />{13QZ <br />Rice hulls (if broadcast seeding) <br />1 <br />Above timberline (11,750') <br />Species <br />Live seed per Ib <br />% of Mix <br />PLS per Acre <br />Festuca saximontana <br />1,200,000 <br />10 <br />0.563 <br />Trisetum spicatum <br />2,500,000 <br />20 <br />0.540 <br />Bice Imft {fftt€d,:.. __ ._......:° .:.............:.',,..`.:.......:....w.. <br />_,.,., <br />Certified weed free hay or straw mulch will also be crimped in place at the rate of 2000 lbs/acre. <br />The entire disturbed area will be reclaimed to rangeland. All seeding will be by the hydraulic <br />method. <br />6. Post -Reclamation Site Drainage <br />During mining, upstream runoff will be captured by the pit. The upstream runoff in the area <br />produces roughly 2.4 ac -ft of runoff. The mining pit has roughly 29 ac -ft of storage capacity, <br />assuming no infiltration. Reclamation will restore the general drainage pattern to the pre mine <br />condition. <br />Cottonwood Pass 2/28/2017 D-2 t,� Leaidn and Aswistc* PLIA: <br />