2. Mining Timetable <br />Due to the small scale of this operation, the Cottonwood Pass Pit mining timetable is short and <br />succinct: <br />Date Activity <br />Summer 2017 Produce material for Cottonwood Pass Road job <br />„. <br />Summer 2018 Paving job on Cottonwood Pass Road <br />Spring/Summer 2019 Complete reclamation <br />Note: Times frames discussed here are approximate and determined by the needs of the construction contract. <br />3. Mine Facilities and Operation <br />Fuel will be brought to the site by a mobile fueling truck. No permanent structures were built <br />within the permit area, as part of this operation. Water is used to control dust on the excavation <br />areas. Water for this operation will be trucked to the site from an offsite source. It is estimated <br />that the operation consumed 500 gallons per day in dust suppression. Portable plants will be <br />onsite for rock crushing, ready mix concrete, and asphalt production. <br />No maintenance of equipment of any kind will take place on site. <br />The following list is the best estimate of the required equipment to be used onsite throughout the <br />mine life: <br />3„.1 Pit Equipment <br />• Grader <br />• Loader <br />• Dozer <br />• Scraper <br />Support equipment will to come to the site on an as -needed basis. <br />There is no blasting as part of this operation. <br />Cottonwood Pass 2/28/2017 C-2 l.rtg Lewuki aud Associates, P4dd' <br />