My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-13_PERMIT FILE - M2017014
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017014
>
2017-04-13_PERMIT FILE - M2017014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:44:46 AM
Creation date
4/14/2017 1:54:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017014
IBM Index Class Name
Permit File
Doc Date
4/13/2017
Doc Name
Application
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Type & Sequence
111
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT C <br />1. General Mining Plan <br />Map E-2 shows the mining plan for the Cottonwood Pass Pit. The pit will serve as a material <br />source for road construction work on Cottonwood Pass Road, immediately south of the pit. <br />Mining will disturb almost all of the 12.5 acres delineated on Map E-1. <br />Access to the site will be from Cottonwood Pass Road, via an existing gravel road coming off of <br />Cottonwood Pass Road east of the pit. Map E-2 shows the access. <br />Topsoil is salvaged from the disturbed area. The topsoil thickness is expected to range from 0-8 <br />inches. Topsoil will be stockpiled in a berm on the west side of the excavation area (See Map E- <br />2). The topsoil in this berm will be used for reclamation. The operation will exist as long raw <br />material for road base and asphalt is needed for the road construction job. This is anticipated to <br />be roughly two years, depending on weather. The pit will be regraded to 3H:1 V slopes, or <br />gentler, in a manner that restores to general drainage pattern of the site. <br />The north portion of the site will be mined in the first year, to produce road base. The southern <br />portion will be mined in the second year for asphalt. <br />Cottonwood Pass 2/28/2017 C-1 / - Greg txwkki and Associate, PW.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.