Laserfiche WebLink
King Mines C1981035 <br />Midterm Review No. 7 <br />Page 53 of 123 <br />Total one-way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$9,817.50 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$233.03 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non-Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): <br />0.50 0.50 <br />Return Time (Hours): <br />0.50 0.50 <br />Loading Time (Hours): <br />2.00 NA <br />Unloading Time (Hours): <br />1.00 NA <br />Subtotals: <br />4.00 1.00 <br />JOB TFAE AND COST <br />Total job time: 8.00 Hours <br />Total job cost: $10,051 <br />