Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: King I&II - mobilize for rill and gully maintenance, X 3 <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 051 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Cost Breakdown: <br />Page 54 of 123 <br />Abbreviation: None <br />Filename: C035-051 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, 400 HP (2ND <br />HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER (25T, 50T, <br />AND 100T) <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EOUIPMENT: <br />Machine Description Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ fleet <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />Cat D3K LGP - 3P 9.20 <br />$13.24 <br />$88.67 <br />3 <br />$305.74 <br />$266.01 <br />$0.00 <br />CAT 12M 16.01 <br />$24.98 <br />$88.67 <br />3 <br />$340.94 <br />$266.01 <br />$0.00 <br />Subtotals: 1 $646.68 1 $532.02 1 $0.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Water Tanker, 2,500 Gal. $29.67 <br />1 3 <br />$89.01 <br />$89.01 <br />Subtotals: 1 $89.01 1 $89.01 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />DURANGO <br />20.00 miles <br />40.00 mph <br />$5,058.78 <br />$89.01 <br />