My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-15_PERMIT FILE - C1981035A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2017-03-15_PERMIT FILE - C1981035A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 9:25:14 AM
Creation date
4/5/2017 9:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/15/2017
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 Page 52 of 123 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: King I&II - mobilize for initial reclamation <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 050 State <br />Date: 2/11/2015 County <br />User: SLB <br />Agency or organization name: <br />EQUIPMENT TRANSPORT RIG COST <br />Cost Breakdown: <br />Colorado <br />La Plata <br />DRMS <br />Abbreviation: None <br />Filename: C035-050 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, 400 HP (2ND <br />HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER (25T, 50T, <br />AND 100T) <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EOUIPMENT: <br />Machine Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr/unit <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />COst/hr/ fleet <br />DOT Permit <br />Cost/ fleet <br />Cat D8T - 8SU <br />47.71 <br />$62.67 <br />$117.55 <br />2 <br />$360.44 <br />$235.10 <br />$0.00 <br />CAT 938H <br />16.34 <br />$21.63 <br />$88.67 <br />2 <br />$220.60 <br />$177.34 <br />$0.00 <br />CAT 12M <br />16.01 <br />$24.98 <br />$88.67 <br />1 <br />$113.65 <br />$88.67 <br />$0.00 <br />CAT 825H <br />36.08 <br />$62.10 <br />$117.55 <br />1 <br />$179.65 <br />$117.55 <br />$0.00 <br />Drill/Broadcast Seeder <br />with Tractor <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$0.00 <br />Power Mulcher <br />Reinco M90 <br />6.00 <br />$7.03 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$0.00 <br />GENERIC 3.0 in. - 1, <br />700 ft. ca . <br />0.00 <br />$17.72 <br />$88.67 <br />1 <br />$106.39 <br />$88.67 <br />$250.00 <br />Subtotals: 1 $1,204.69 1 $884.67 1 $250.00 <br />ROADABLE EOUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size <br />Haul Trip Return Trip <br />Cost/hr/ fleet Cost/hr/ fleet <br />Generic 10-12 c , 6x4 $101.68 2 <br />$203.36 $203.36 <br />Water Tanker, 2,500 Gal. $29.67 1 <br />$29.67 $29.67 <br />Subtotals: 1 $233.03 1 $233.03 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: DURANGO <br />
The URL can be used to link to this page
Your browser does not support the video tag.