My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-20_REVISION - M2000144
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000144
>
2017-03-20_REVISION - M2000144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:29 PM
Creation date
3/21/2017 10:31:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000144
IBM Index Class Name
Revision
Doc Date
3/20/2017
Doc Name
Request For Amendment To Permit
From
Bestway Concrete Company
To
DRMS
Type & Sequence
AM1
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The revegetation seeding and plant list on the Reclamation Plan Map contains the <br />preferred species of grasses, shrubs and trees to be planted. <br />Seeding will take place once final grading and replacement of topsoil have been <br />completed. Timing of seeding will be consistent with standard horticultural practice for <br />dryland applications - generally between late September and the middle of April to ensure <br />there is adequate moisture for germination. <br />(a) A plan or schedule indicating how and when reclamation will be implemented. <br />Include. <br />i- An estimate of the periods of time which will be required for the various stages or <br />phases of reclamation. <br />Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br />ii. A description of the size and location of each area to be reclaimed during each <br />phase. <br />Please refer to the Reclamation Plan Map (Exhibit F). <br />iii. Outlining the sequence in which each stage or phase of reclamation will be carried <br />out <br />Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br />() A description of - <br />i. Final grading -maximum anticipated slope gradient or expected ranges thereof,• <br />The finished slopes of the reservoir will be 3 horizontal to 1 vertical. <br />A Seeding -- types, mixtures, quantities and time of application, <br />Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br />utilized. The operator will seed during the appropriate season to ensure adequate <br />moisture for germination and implement weed controls to allow the grasses to successfully <br />establish. Additional plantings may be installed once the reservoirs are full of water and <br />the grasses are established_ <br />iii. Fertilization -types, mixtures, quantities, and time of application, <br />The type and application rate of fertilizer shall be determined based on a soil test at the <br />time of final reclamation. <br />iv. Re vegetation - types of trees, shrubs, etc.; and <br />Please refer to the Reclamation and landscape Plan Maps for the types, quantities and <br />location of trees and shrubs to be planted. <br />v. Topsoiling - specify anticipated minimum depth arrange of depths for those areas <br />where topsoil will be replaced. <br />Bestway Concrete & Aggregates —Lee Amendment -N. La Poudre Mine — MLRB 112 Permit Application <br />Exhibit E - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.