My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-20_REVISION - M2000144
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000144
>
2017-03-20_REVISION - M2000144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:29 PM
Creation date
3/21/2017 10:31:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000144
IBM Index Class Name
Revision
Doc Date
3/20/2017
Doc Name
Request For Amendment To Permit
From
Bestway Concrete Company
To
DRMS
Type & Sequence
AM1
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
noxious and weedy species during the project and the replacement of desirable graminoid, <br />forb, shrub and tree species during reclamation will result in enhancement of wildlife <br />habitat on the project site. <br />Section 3.1.9 Topsoding. Topsoil shall be removed and segregated from other spoil. <br />Topsoil stockpiles shall be stored in places and configurations to minimize erosion and <br />located in areas where disturbance by ongoing mining operations will be minimized. Once <br />stockpiled, topsoil shall be rehandled as little as possible. Stockpiles that will remain in <br />place for more than one growing season will receive vegetative cover, as outlined on the <br />Reclamation Plan Map, as soon as possible to minimize erosion. <br />Section 3. L 10 Revegetatiorr. In those areas where revegetation is part of the <br />reclamation plan, the land shall be revegetated in a manner that establishes a diverse, <br />effective, and long-lasting vegetative cover that is capable of self -regeneration without <br />continued dependence on irrigation or fertilizer and is at least equal in extent of cover to <br />the natural vegetation of the surrounding area. The proposed seed -mix and plantings for <br />reclamation are outlined on the Reclamation Plan included in Exhibit F of this application. <br />Section 3.1.11 Buildings and Structures Please refer to the enclosed Reclamation Plan <br />included in Exhibit F. <br />Section 3. L 12 Signs and Markers The Operator will post appropriate signage at the <br />entrance to the mine site. The permit area will be marked by existing fencing, or proximity <br />to existing County roads. <br />(d) Plans for topsoil segregation, preservation and replacement; for stabilization, <br />compaction and grading of spoil, and for re vegetation. <br />Topsoil will be removed and segregated from other spoil. Topsoil not needed for <br />reclamation may be sold or removed from the site. For reclamation, topsoil will be <br />replaced by a scraper and generally graded with a blade. Grading shall be done in a <br />manner that controls erosion and siltation of the affected land and protects areas outside <br />the affected land from slides and other damage. In addition, backfilling and grading shall <br />be completed as soon as feasible after the mining process. <br />Final grading will create a final topography that is appropriate for the final land use. For <br />example, grades on the site will be returned to existing (pre -mining) grade. Topsoil will be <br />uniformly placed and spread on areas disturbed by the mining. The minimum thickness <br />shall be 6 inches above the surrounding finished grade, consistent with existing topsoil <br />depths on-site. The topsoil shall be keyed to the underlying and surrounding material by <br />the use of harrows, ropers or other equipment suitable for the purpose. <br />In those areas where revegetation is part of the reclamation plan, the Operator will <br />revegetate the land in such a manner so as to establish a diverse, effective, and long- <br />lasting vegetative cover that is capable of self -regeneration without continued dependence <br />on irrigation or fertilizer and is at least equal in extent of cover to the natural vegetation of <br />the surrounding area. Seed will be drilled and mulched. <br />Bestway Concrete & Aggregates — Lee Amendment -N. La Poudre Mine — MLRB 112 Permit Application <br />Exhibit E - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.