Laserfiche WebLink
Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br />anticipated high water line. The minimum thickness shall be 6 inches above the <br />surrounding finished grade. <br />WEED MANAGEMENT PLAN <br />Bestway Concrete & Aggregates has a full-time weed manager on staff. This person is responsible <br />for monitoring and controlling noxious weeds as they appear. Bestway Concrete typically prefers <br />to control weeds mechanically, by mowing and/or discing. If necessary, weeds will be killed with a <br />contact herbicide. Bestway Concrete has all of the necessary equipment in house to perform these <br />tasks. <br />Bestway Concrete & Aggregates — Lee Amendment -N. La Poudre Mine — MLRB 112 Permit Application <br />Exhibit E - 5 <br />