Laserfiche WebLink
Table L-1 Reclamation Task and Cost Estimate <br />Activity Description Time (Months) Cost ($) <br />Backfill active excavation to groundwater table 0.1 i 26759 <br />Rerade upper pper slopes of active excavation to 3H:1V 0.5 50370 <br />Topsoil disturbed areas to a depth of 8 inches 2 22687 <br />Seed and mulch all disturbed areas 2 10500 <br />Totals U $110;316 <br />DRMS Costs (28% x direct costs) $30,888 <br />Total -Bond Amount $141,204 <br />Fairplay A tr Pit March 2 017 <br />L-2 Ortg LcwkU aW Asndolm hd.0 <br />