My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2017-03-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2017 6:33:12 AM
Creation date
3/2/2017 12:33:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
3/1/2017
Doc Name
Cost Estimate
From
Jason Musick
To
Clayton Wein
Type & Sequence
RN4
Email Name
JDM
CCW
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />0.786 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.2794 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />480.26 LCY/hr <br />1921.04 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.573/LCY <br />Total job time: 158.03 Hours <br />Total job cost: $174,031 <br />Page 11 of 340 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.