Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />BULLDOZER WORK <br />D -Portal Bench <br />Permit Action: RN4 <br />Task #: 002 State: Colorado <br />Date: 3/1/2017 County: Delta <br />7:09:20 AM <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Page 10 of 340 <br />Permit/Job#: C1996083 <br />Abbreviation: None <br />Filename: C083-002 <br />$122.17 <br />Utilization % <br />NA <br />$111.29 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $275.31 <br />Total Fleet Cost/Hour: $1,101.22 <br />MATERIAL QUANTITIES <br />Initial Volume: 260,593 <br />Swell factor: 1.165 <br />Loose volume: 303,591 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,718.9 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 10% <br />gradient: <br />Average site altitude: 6,900 feet <br />Material weight: 2,900 lbs/LCY <br />CIRCES Cost Estimating Software <br />