Laserfiche WebLink
Truck Cvcle Time: <br />Truck Exchange Time: 0.70 Minutes <br />Truck Load Time: 3.520 Minutes <br />Truck Maneuver and Dump 1.10 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 9 of 340 <br />0.700 <br />Minutes <br />3.520 <br />Minutes <br />1.100 <br />Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />maintained 3.0 <br />Grade (%) <br />Roll. Res <br />Total Res <br />Haul Route: <br />Travel <br />Loading Tool unit <br />Seg # <br />Haul Distance <br />Grade (%) <br />(%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />339.28 <br />(Ft) <br />281.60 LCY/Hour <br />Optimal No. of Trucks: <br />(%) <br />(%) <br />(fpm) <br />Time <br />600.00 <br />-17.00 <br />3.00 <br />-14.00 <br />1377 <br />0.566 <br />LCY/Hour <br />mm <br />LCY/Hour <br />JOB TIME AND COST <br />1 <br />600.00 <br />17.00 <br />1 <br />3.00 <br />20.00 <br />379 <br />1.588 <br />/LCY Total job cost: $421,882 <br />Haul Time: <br />1.588 <br />minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />339.28 <br />LCY/Hour Adjusted for job efficiency: <br />281.60 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />600.00 <br />-17.00 <br />3.00 <br />-14.00 <br />1377 <br />0.566 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.566 <br />minutes <br />Total Truck Cycle Time: 7.474 <br />minutes <br />Loading Tool unit <br />Production <br />600.89 <br />LCY/Hour Adjusted for job efficiency: <br />498.74 LCY/Hour <br />Truck Unit Production <br />339.28 <br />LCY/Hour Adjusted for job efficiency: <br />281.60 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 563.20 <br />LCY/Hour <br />Adjusted single truck/loader team production: 498.74 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 498.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 609.56 <br />Hours <br />Unit cost: <br />$1.388 <br />/LCY Total job cost: $421,882 <br />CIRCES Cost Estimating Software <br />