Laserfiche WebLink
Page 12 of 340 <br />BULLDOZER WORK <br />Task description: Rip and Regrade Material Storage Area at Gob Pile <br />Site: Bowie No. 2 Mine Permit Action: RN4 Permit/Job#: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 005 <br />Date: 3/1/2017 <br />7:10:42 AM <br />State: Colorado <br />County: Delta <br />User: JDM <br />Agency or organization name: <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C083-005 <br />$122.17 <br />Utilization % <br />NA <br />$111.29 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />$275.31 <br />$1,101.22 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,630 <br />Swell factor: 1.165 <br />Loose volume: 4,229 LCY <br />Source of estimated volume: Map 15-1 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,000 feet <br />2,900 lbs/LCY <br />CIRCES Cost Estimating Software <br />