Laserfiche WebLink
1.3 SUBMITTAL OF WARRANTIES CALLED FOR IN THE CONTRACT <br />DOCUMENTS <br />A. Warranties called for in the Contract Documents shall be accepted as follows: <br />1. Engineer will review the warranty only to verify that the warranty defines the <br />requirements called for in the Contract Documents. <br />2. During the Correction Period of the project, the warranty shall be for the use of the <br />Contractor as it relates to Contractor's responsibilities under the Correction Period. <br />3. After the expiration of the Correction Period, the rights under the warranty shall pass <br />to the Owner for Owner's use of their facilities. <br />PART 2 — PRODUCTS (Not Applicable) <br />PART 3 — EXECUTION (Not Applicable) <br />END OF SECTION 01740 <br />Warranties February 2017 01740-2 <br />