My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-21_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2017-02-21_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 8:15:08 AM
Creation date
2/21/2017 4:24:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
2/21/2017
Doc Name
Request for Technical Revision
From
Battle Mountains Resources, Inc.
To
DRMS
Type & Sequence
TR34
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Off -Site Storage <br />1. Provide when site does not permit on-site storage or protection. <br />E. Inspection: Arrange storage to provide access for inspection. Periodically inspect to <br />assure products are undamaged, and are maintained under recommended conditions. <br />F. Protection of Work: Equipment left unconnected shall be capped, plugged or otherwise <br />properly protected to prevent damage or the intrusion of foreign matter while in storage at <br />the project site or during installation. <br />1.5 PRODUCTS OPTIONS <br />A. Reference Agreement, Contract, and Specifications concerning product options, <br />limitations on substitutions, "or equal," Contractor representation, and submittal <br />procedures requirements. <br />B. Substitutions: All proposed substitutions must be submitted in writing for approval by <br />the Engineer a minimum of ten (10) working days prior to installation. <br />1. Proposed substitutes must be accompanied by a line -by-line specification compliance <br />document. <br />2. By using substitutions, the contractor accepts responsibility and associated costs for <br />all required modifications to the Work. <br />3. Provide complete engineered shop drawings. <br />1.6 SPARE PARTS <br />A. Turn spare parts over to Owner at Substantial Completion. <br />1. Provide Owner with written list of spare parts being provided. <br />PART 2 — PRODUCTS (Not Applicable) <br />PART 3 — EXECUTION <br />3.1 INSTALLATION AND GENERAL CONSTRUCTION REQUIREMENTS <br />A. Hold pre -installation meeting at site before installation of each major component of work <br />which requires coordination with other units of work. Installer(s) of particular work and <br />affected work shall attend. Manufacturer's representative(s) may also be required to <br />attend if requested by the Engineer or Owner. <br />1. Notify Engineer of meeting time. <br />2. Discuss coordination of Work with other work and include, as necessary, Shop <br />Materials and Equipment February 2017 01600-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.