Laserfiche WebLink
Truck Bed (volume) Basis: <br />Struck Volume: <br />10.00 <br />LCY <br />Heaped Volume: <br />12.00 <br />LCY <br />Average Volume: <br />11.00 <br />LCY <br />Adjusted Volume: <br />12.00 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 9.00 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 5.000 LCY (heaped) <br />Bucket Fill Factor: 0.900 Other - soil, boulders, roots 80 -100% 0.900 <br />Adjusted Capacity: 4.500 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6300 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />LCY <br />2 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />Cycle Time Factors Factor (min.) <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />LCY <br />2 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />Cycle Time Factors Factor (min.) <br />0.500 minutes <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />Cat HB <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />Cat HB <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />Cat HB <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.060 <br />0.440 <br />0.540 <br />minutes <br />minutes <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 0.540 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Minutes <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />0.540 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />0.900 <br />Minutes <br />Road Condition: Firm, smooth, rolling, dirt/it. surfaced, watered. <br />CIRCES Cost Estimating Software <br />