Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Replace topsoil from stockpile #5 <br />Site: West Elk Mine Permit Action: RN7-subtotal A Permit/Job#: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado <br />Date: 2/9/2017 County: Gunnison <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 10-12 c , 6x4 <br />-Loader: CAT 966H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump, Area: Cat D9T - 9SU <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C007-008 <br />Shift basis: 1 per day <br />Cast Breakdown: Truck/Loader Team Sunnort Fouinment Maintenance Fouinment <br />Total work team cost/hour: $833.18 <br />MATERIAL OUANTITIES <br />Initial volume: 120 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />NA NA <br />Ownership cost/hour: <br />$17.89 <br />$36.26 <br />$97.48 <br />$97.48 <br />NA NA <br />Operating cost/hour: <br />$53.15 <br />$52.06 <br />$103.60 <br />$103.60 <br />NA NA <br />%Utilization -riper: <br />NA <br />0 <br />100 <br />100 <br />NA NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />$10.74 <br />$10.74 <br />NA NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$6.60 <br />$6.60 <br />NA NA <br />Operator cost/hour: <br />$0.00 <br />$38.60 <br />$38.89 <br />$38.89 <br />NA NA <br />Unit Subtotals: <br />$71.04 <br />$126.92 <br />$246.57 <br />$246.57 <br />NA NA <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />0 0 <br />Group Subtotals: <br />Work: $340.04 <br />Support: $493.14 <br />Maint: $0.00 <br />Total work team cost/hour: $833.18 <br />MATERIAL OUANTITIES <br />Initial volume: 120 <br />CCY <br />Loose volume: 135 <br />LCY <br />Source of estimated volume: <br />Page 2.05-53 <br />Source of estimated swell factor: <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payloadweight) Basis: <br />Material weight: 2,550 <br />Description: Earth - <br />Rated Payload: 35,400 <br />Payload Capacity: 13.88 <br />Swell factor: 1.125 <br />Pounds/LCY <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />