My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-17_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2017-02-17_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 2:04:40 PM
Creation date
2/17/2017 11:02:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
2/17/2017
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Leigh Simmons
Type & Sequence
RN7
Email Name
JHB
JRS
LDS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />600.00 <br />8.30 <br />3.00 <br />11.30 <br />1018 <br />0.602 <br />Haul Time: 0.602 minutes <br />Rehim Route - <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />mm <br />1 <br />600.00 <br />-8.30 <br />3.00 <br />-5.30 <br />2938 <br />0.265 <br />Return Time: 0.265 <br />Total Truck Cycle Time: 2.807 <br />Loading Tool unit <br />Production 519.23 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />192.38 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 479.02 <br />Adjusted single truck/loader team production: 430.96 <br />Adjusted multiple truck/loader team production: 430.96 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.933 /LCY <br />minutes <br />minutes <br />430.96 LCY/Hour <br />159.67 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 0.31 Hours <br />Total job cost: $261 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.