My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-08_REPORT - M1983194
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983194
>
2017-02-08_REPORT - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 9:09:39 AM
Creation date
2/10/2017 10:49:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REPORT
Doc Date
2/8/2017
Doc Name
Annual Fee/Report/Map
From
Natural Soda, LLC
To
DRMS
Annual Report Year
2017
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AA Natural Soda LLC 2016 Project Status Report & Annual Plan of Development <br /> ' 6.3 Reclamation Activity <br /> 6.3.1 Regrading & Scarification <br /> Regrading and scarification activities occurred in 2016 at the BG-8 and 15H-SSMW well <br /> pads to support final reclamation. Additionally, the small mud pits on both well pads <br /> were filled and regraded in the fall of 2016. <br /> ' 6.3.2 Seeding & Weed Control <br /> The majority of seeding activity in 2016 focused on the areas disturbed following the <br /> 2014 RDP project. A few of the abandoned 2014 RDP well pads that were previously <br /> ' reseeded, were observed to be supporting weed populations in 2015. NS applied weed <br /> control, and reseeded these pads in the spring of 2016. NS will continue monitoring the <br /> 2014 RDP and 2015 P&A disturbed areas to control weeds and reseed if necessary. <br /> ' Additionally, the freshly recontoured surfaces of the BG-8 and 15H-SSMW well pads <br /> were reseeded with the BLM approved final seed mix. NS also applied interim seed mix <br /> to the 15H/17H slopes and spoil piles to stabilize and minimize erosion. The <br /> ' 2016 Vegetation Monitoring Reclamation Status Report prepared by Mr. Rusty Roberts <br /> can found in Appendix D of this report. <br /> ' 6.3.3 Reclamation Fencing <br /> Repair and maintenance was performed, as necessary, on existing fences in 2016 as <br /> ' needed. Fencing is utilized to keep livestock and wildlife out of the reclaimed areas. <br /> 6.3.4 Precipitation <br /> ' NS installed a Pulsar Weather Station in February 2016 to improve weather monitoring <br /> and recording in the vicinity of the plant. Based on perennial vegetation, which is an <br /> indicator of long-term precipitation, the "normal" precipitation for the NS site is 12-14 <br /> ' inches for the calendar year. The distribution of precipitation is important for proper <br /> reclamation. Table 9 provides a composite of precipitation from the NS mine site: <br /> O,Ay}UpB�&ASSOCIATES. INC. . 25 January 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.