Laserfiche WebLink
Natural Soda LLC 2016 Project Status Report & Annual Plan of Development <br /> 6.0 Land Disturbance and Reclamation <br /> ' 6.1 Summary of 2016 Disturbance <br /> NS increased the overall disturbance acreage by approximately 0.4 acres in 2016. The <br /> ' total disturbed acreage reported in 2015 was 94.5 acres. The increase in 2016 total <br /> disturbance was due to the construction of the 15H-SSMW well pad and access road. <br /> Table 8 lists the disturbed acreage as of December 2016. <br /> ' Table 8: Disturbed Acreage <br /> Process Area: Acres: <br /> Plant Site Disturbed 26.8 <br /> Plant Site Interim Reclaimed 4.5 <br /> Well Field: <br /> ' Roads Disturbed 2.5 <br /> Well Pads Disturbed 21 .3 <br /> Roads/Misc. Interim Reclaimed 5.3 <br /> ' Well Pads Interim Reclaimed 12.7 <br /> Well Pad Reclaimed 21.8 <br /> Total Disturbance: 94.9 <br /> 6.2 Regulatory Compliance <br /> 6.2.1 Regulatory Activity <br /> ' In 2016, all required reports were submitted in a timely manner. Required forms were <br /> submitted to the appropriate agencies regarding all activities pertaining to the new wells <br /> drilled & associated plugging and abandonment operations. <br /> ' DAUB .&ASSOCIATES. INC. %\� 24 January 2017 <br />