Laserfiche WebLink
AA Natural Soda LLC 2016 Project Status Report & Annual Plan of Development <br /> 3.2.3 EPA Notification — 2017 Schedule of planned Mechanical <br /> Integrity Test (MIT) (Confidential) <br /> ' Per EPA UIC Permit C030358-00000 Final Area Permit requirements the <br /> following MIT Part I and MIT Part II testing is planned for 2017. <br /> ' o 121-1-1 Injection Well — routine 5-year anniversary MIT Part I pressure test <br /> will be conducted prior to the anniversary date of May, 1 , 2017 <br /> ' o 121-1-1 Injection Well — routine 5-year anniversary MIT Part II temperature <br /> logging will be conducted prior to the anniversary date of August, 29 2017. <br /> o 161-1-1 Injection Well — initial, routine MIT Part I pressure testing will be <br /> conducted during well completion operations in 2017 per UIC permit <br /> ' stipulations. <br /> o 161-1-1 Injection Well — initial, routine MIT Part II temperature logging will be <br /> ' conducted following well completion operations in 2017 per UIC permit <br /> stipulations. <br /> ' 3.2.4 EPA Notification — 2017 Schedule of planned SSMW Logging <br /> (GR/CCL) (Confidential) <br /> • Per EPA UIC Permit C030358-00000 Final Area Permit requirements the <br /> ' following SSMW Logging (GR/CCL) is planned for 2017. <br /> o Pursuant to the planned 2017 retirement of the 11 H mining intervals, NS <br /> ' will perform final, routine SSMW logging in the BG-8 (DS-4) well. <br /> o NS will schedule and collect routine SSMW logs in 2017 for the <br /> 12H mining interval, from the BG-5 SSMW, pursuant to UIC permit <br /> stipulations. <br /> o NS will schedule and collect routine SSMW logs in 2017 for the 13H and <br /> 14H mining intervals, from the IDS-5 SSMW, pursuant to UIC permit <br /> stipulations. <br /> 1 <br /> t <br /> tDAUB&ASSOCIATES, INC. ,IIp .� 10 January 2017 <br />