Laserfiche WebLink
BEINGCREATED ON THE NORTH SIDE OF THE YARD. SUBMITTAL INCLUDES <br />REVISED FIGURE 2.2-2. SURFACE FACILITIES. <br />Status: This stipulation was satisfied and terminated on April 20, 1989. <br />Stipulation No. 18 <br />THE PERMITTEE SHALL REVISE ALL PLAN VIEW TOPOGRAPHIC MAPS <br />CONTAINEDWITHIN THE APPROVED PERMIT APPLICATION AS NECESSARY TO <br />SHOW AS -BUILT CONTOURS OF DISTURBED AREA THAT HAVE CHANGED SINCE THE <br />MAPS WERE ORIGINALLY SUBMITTED. THE REVISED MAP SMUST BE SUBMITTEDTO <br />THE DIVISION NO LATER THAN AUGUST 31, 1990. <br />Status: This stipulation was satisfied and terminated on January 29, 1992. <br />Stipulation No. 19 <br />PRIOR TO CONDUCTING ANY MINING ACTIVITIES WHICH WOULD RESULT IN <br />SUBSIDENCE, SALT CREEK MINING COMPANY SHALL PROVIDE THE DIVISION WITH <br />THE CULTURAL AND HISTORIC RESOURCE INFORMATION AS REQUIRED BY RULE <br />2.04.4. <br />Status: This stipulation was satisfied and terminated on December 31, 1996. <br />Stipulation No. 20 <br />PRIOR TO MINING BEYOND THE PREVIOUSLY APPROVED PERMIT BOUNDARY, SALT <br />CREEK MINING COMPANY SHALL OBTAIN AN APPROVAL OF ITS RESOURCE <br />RECOVERY AND PROTECTION PLAN FROM THE UNITED STATES BUREAU OF LAND <br />MANAGEMENT. <br />Status: This stipulation was satisfied and terminated on December 31, 1993. <br />Stipulation No. 21 <br />STIPULATION 21 WAS IMPOSED AS A REQUIREMENT FORFIELD MINOR REVISION 22. <br />MR -22 APPROVED CONSTRUCTION OF A SEDIMENT DRYING AREA ADJACENT TO <br />THE SEDIMENT POND. SUBMITTAL OF REVISED MAPS 2.2-2 AND 2.2-3 FULFULLED <br />THE REQUIREMENT OF THIS STIPULATION. <br />Status: This stipulation was satisfied and terminated on August 3, 1992. <br />Stipulation No. 22 <br />THE PERMITTEE WILL SUBMIT ADDITIONAL BOND IN THE AMOUNT OF $25,147.00 <br />WITHIN30 DAYS AFTER PUBLIC COMMENT PEROIDS ENDS. PERMIT WILL NOT ISSUE <br />PRIOR TO BOND ACCEPTANCE. <br />0 <br />