Status: This stipulation was satisfied and terminated on February 11, 1999. <br />Stipulation No. 23 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE OPERATOR WILL SUBMIT A RELEVANT <br />SHOWING STATEMENT IN LIEU OF CERTIFICATION FOR THE MCCLANE <br />ACCESS/HAUL ROAD, PURSUANT TO RULE 4.03.L(1)(13)(II). <br />Status: This stipulation was satisfied and terminated on February 11, 1999. <br />Stipulation No. 24 <br />TABLE 3.1-1 WILL BE EXPANDED TO ADDRESS THE RECLAIMED CHANNELS IN THE <br />VICINITY OF THE RECLAIMED LOWER ACCESS ROAD AND SEDIMENT <br />POND/TOPSOIL STOCKPILE SITE. RIPRAP SIZING, GRADATION, AND INSTALLATION <br />DESIGN DETAILS WILL BE PROVIDED FOR THOSE CHANNEL SEGMENTS WHICH <br />REQUIRE RIPRAP PROTECTION, AND RECLAMATION PLAN TEXT WILL BE AMENDED <br />TO SPECIFY THAT CONCRETE FROM FOUNDATIONS AND OTHER SOURCES WILL BE <br />BURIED AT LEAST FOUR FEET BELOW GRADE, IN LOCATIONS OTHER THAN THE <br />RECLAIMED CHANNELS. THESE AMENDMENTS WILL BE SUBMITTED WITHIN A <br />COMPLETE TECHNICAL REVISION APPLICATION WITHIN 60 DAYS OF PERMIT <br />ISSUANCE. <br />Status: This stipulation was satisfied and terminated on February 11, 1999. <br />Stipulation No. 25 <br />A NARRATIVE DESCRIPTION, LONGITUDINAL PROFILE, AND APPROPRIATE CROSS <br />SECTIONS OF THE TEMPORARY DIVERSION CHANNEL CREATED BY THE ROAD <br />CROSSING OF THE MCCLANE DRAINAGE CHANNEL WILL BE SUBMITTED FOR <br />INCLUSION IN THE APPLICATION, ALONG WITH APPLICABLE FLOW PARAMETERS. <br />SUFFICIENT INFORMATION WILL BE SUBMITTED TO DEMONSTRATE COMPLIANCE <br />WITH THE REQUIREMENTS OF 4.05.3(1), (2), (4), (5), (6) AND (7), AND 4.03.1(4)(A)(I). <br />THESE AMENDMENTS WILL BE SUBMITTED WITHIN A COMPLETE TECHNICAL <br />REVISION APPLICATION WITHIN 60 DAYS OF PERMIT ISSUANCE, IF COMPLIANCE <br />WITH THE CITED REQUIREMENTS CANNOT BE DEMONSTRATED, THE REVISION <br />APPLICATION WILL ADDRESS NECESSARY MODIFICATIONS TO THE DIVERSION <br />CHANNEL. <br />Status: This stipulation was satisfied and terminated on February 11, 1999. <br />Stipulation No. 28 <br />WITHIN SIX MONTHS OF PERMIT ISSUANCE AND PRIOR TO ANY SURFACE DISPOSAL <br />OF COAL MINE WASTE, THE PERMITTEE WILL IDENTIFY THE SOURCE OF AN <br />APPROPRIATE VOLUME OF SUITABLE NON-TOXIC, NON-COMBUSTIBLE COVER <br />MATERIAL TO BE PLACED OVER THE GRADED REFUSE PRIOR TO TOPSOILING, <br />PUSUANT TO RULE 4.10.4(5). UNLESS ANALYSES ARE PROVIDED WHICH <br />10 <br />