Laserfiche WebLink
CONDUCT PERCOLATION TEST FOR PORPOSED LEACH FIELD. SUBMIT REVISED <br />MAPS AND PAGES FOR MR NO. 10. SUBMITTAL SHOULD INCLUDE REVISED MAPS <br />2.2-3 AND 2.2-4. <br />Status: This stipulation was satisfied and terminated on October 7, 1988. <br />Stipulation No. 13 <br />INSTALL CULVERT EXTENSION AND HEADWALL. SUBMIT REVISED MAPS AND <br />PAGES FOR MR NO. 11. SUBMITTAL SHOULD INCLUDE REVISED MAP 2.2-2. <br />Status: This stipulation was satisfied and terminated on October 7, 1988. <br />Stipulation No. 14 <br />A REPLACEMENT PERFORMANCE BOND IN THE AMOUNT OF $136,000.00, OR A <br />BBOND RIDER INCREASING EXISTING COVERAGE BY $5,000.00, PAYABLE TO THE <br />STATE OF COLORADO AND THE OFFICE OF SURFACE MINING, MUST BE FILED WITH <br />AND ACCEPTED BY THE DIVISION PRIOR TO INITIATING ANY DISTURBANCE <br />ASSOCIATED WITH THE TECHNICAL REVISION APPROVAL. <br />Status: This stipulation was satisfied and terminated on November 22, 1988. <br />Stipulation No. 15 <br />THE OPERATOR PROPOSES TO ADD AN EXTENSION TO THE 42" CMP WHICH <br />CONVEYS UNDISTURBED DRAINAGE FROM ABOVE THE SHOP TO BELOW THE PAD. <br />THE CMP WILL BE BURIED AND OUTFALL WILL OCCUR NEAR THE DISCHARGE <br />OFTHE NORTH DIVERSION CULVERT. ENERGY DISSIPATERS WILL BE PROVIDED. <br />SUBMITTAL OF REVISED FIGURE 2.2-3 SURFACE WATER CONTROL SYSTEMS. <br />Status: This stipulation was satisfied and terminated on April 20, 1989. <br />Stipulation No. 16 <br />OPERATOR PROPOSES TO MOVE THE EXISTING ACCESS ROAD AT THE PORTAL <br />AREA SOUTH OF THE CURRENT LOCATIN BY APPROXIMATELY 25 FT. ALL <br />ROADDESIGNS REMAIN THE SAME AS THE CURRENT ROAD. SUBMITTAL SHOULD <br />INCLUDE REVISED FIGURE 2.2-2 SURFACE FACILITIES. <br />Status: This stipulation was satisfied and terminated on April 20, 1989. <br />Stipulation No. 17 <br />THE OPERATOR PROPOSES TO MOVE THE CRUSHER UNDERNEATH THE CONVEYOR <br />AND EXTEND THE CONVEYOR OUT OVER THE STOCKPILE AREA. THE CRUSHER <br />WILL BE SET INTO THE BANK BELOW THE PORTAL. A SAFETY BERM IS <br />